Recently, a Taian customer bought our medical x ray table. We packed the medical x ray table and shipped it. After that, we informed the customer of the express delivery number. The customer has confirmed that the medical x ray table has been received, and the x ray table is not damaged. Understand how this is installed, tell customers not to worry, we can perform video-guided installation, tell customers to read the installation and commissioning instructions we shipped with the goods, and then highlight any things that we do n’t understand, the video guide installation will be contacted with the engineer.
The first is the column on the medical x ray table. Install the column on the right side of the filming bed with pulleys. Align the pulley for installation. The forklift will be used during the installation. The column is very heavy. During the installation process, one person controls the alignment of the forklift and the coating table. Two The person will assist the column. The forklift operator will also control the forklift to move up and down slowly. Slight negligence may cause a safety accident. Therefore, this is the most important link.
The second is the installation of the controller bulb, not upside down, especially the bulb ferrule and expansion screw. If inverted, it will cause the bulb to fall off, causing safety damage to the photographer. The bracket, baffle and counterweight must be installed correctly.
Finally, after the installation is complete, connect the power supply section. The power supply connection section must be controlled according to the strict requirements of the manual. Otherwise, it is not worth the unnecessary losses. After the power supply connection is completed, it must be tested and must be activated multiple times. Switch to see if there is poor contact or leakage. After inspection, it can be used normally.
Author:Amy
Tel: +86 18953679166
E-mail: service@newheek.com
Company: Weifang Newheek Electronic Technology Co., Ltd.